Share

Rugonal Shares Tips for Preparing Floor Surfaces Before Installation

Last updated: 5 Oct 2026
111 Views
Installing new flooring is a significant investment, both in terms of time and cost. However, one crucial step is often overlooked: floor surface preparation. A solid foundation is key to the success and durability of any flooring installation. Without proper preparation, even the best materials can develop problems later, from cracking to bubbling. Rugonal understands this importance and shares some great tips for ensuring your floor surface is perfectly prepared before installation, ensuring a maximum and long-lasting finish.
 

1. Thoroughly Clean the Floor Surface

The first step is to thoroughly clean the area. Ensure there is no dust, dirt, oil, grease, paint, or old adhesive residue. Use an industrial vacuum, brush, or degreaser if necessary. A clean surface will ensure the adhesive adheres properly and prevent dirt from getting trapped beneath the new flooring.
 

2. Check and Repair Flatness

Surface flatness is crucial, especially for materials like rubber flooring that follow the contours of the base precisely. Use a tape measure or a long ruler to check for any uneven areas, bumps, or holes. Even the slightest unevenness can cause a new floor to install imperfectly, create weak spots, or even damage the material over time. Fill gaps or smooth out bumps with a suitable leveling compound. This careful preparation will ensure that your investment in high-quality materials, such as RUGONAL's premium rubber flooring solutions, delivers maximum performance and durability.
 

3. Moisture Testing Moisture

is the number one enemy of flooring installation. High moisture levels in subfloors (especially concrete) can cause serious problems such as bulging, mold, or adhesive failure. Use a specialized moisture meter to check the moisture content of the surface. If the moisture level exceeds the limits recommended by the flooring or adhesive manufacturer, allow the floor to dry or apply a moisture sealer. To ensure your RUGONAL rubber flooring is installed with full integrity, never skip this important step.
 

4. Primer Application (If Necessary)

For some types of subfloors or to improve adhesive adhesion, a primer application may be necessary. Primer acts as a bridge between the subfloor and the adhesive, improving adhesion and creating a more stable surface. Consult with your flooring or adhesive manufacturer to determine if a primer is necessary for your project.
 

5. Precision Measuring and Marking

Before starting installation, take accurate measurements and draw guidelines on the floor. This will help you install materials straight and neatly, minimizing waste. Plan your pattern or tile layout carefully for the best aesthetic results.
 
Floor surface preparation may seem time-consuming and detailed, but the long-term benefits far outweigh the effort. By following these tips from Rugonal, you'll not only ensure a successful installation but also extend the life and beauty of your new floor. Remember, a strong foundation is the best investment for any flooring, especially for materials that prioritize safety and durability like rubber flooring. Choose rubber flooring solutions from RUGONAL for guaranteed quality that will last for years with proper preparation.

Related Content
icon-whatsapp
Rugonal
Typically replies in a few hours
Bagaimana saya bisa membantu Anda?
Start Chat
Website ini menggunakan kukis untuk pengalaman terbaik Anda, informasi lebih lanjut silakan kunjungi Privacy Policy and Cookies Policy
Powered By MakeWebEasy Logo MakeWebEasy